Early Infrastructure (1875–1926)

The earliest entries focus on establishing basic utilities and public works:

  • 1875: The Borough authorized a bond issue to secure water supplies for fire protection and other uses. Subsequent resolutions in 1875 authorized $11,000 for erecting waterworks.
  • 1914–1915: Significant debt was incurred ($15,000 and $35,000) for erecting a boiler house, paving streets (Crawford Street and Cherry Alley), laying sewers, constructing a sewage disposal plant, and purchasing fire engines.
  • 1921–1926: The Borough focused on water infrastructure, authorizing $80,000 for land and construction of a reservoir and pumping station. Later resolutions expressed the desire to erect a filtering plant ($45,000) and amended previous orders.

Mid-Century Improvements (1948–1972)

  • 1948: $30,000 was borrowed to help establish a municipal park.
  • 1960: The Borough expressed the desire to increase indebtedness by $75,000 for capital improvements to existing swimming pool facilities.
  • 1972: A significant lease rental debt of $800,000 was incurred.

Late 20th Century Projects (1975–2004)

This period saw borrowing for parks, vehicle purchases, and major sewage system upgrades:

  • 1975: $10,000 for field lights at Memorial Field.
  • 1977: $25,000 to pay for extraordinary expenses and damage to water/sewer lines from a harsh winter.
  • 1986–1992: Major investments in sewage treatment, including an initial authorization not to exceed $264,000 and subsequent increases totaling over $4. 4 million for upgrading the plant.
  • 1994: Funding was secured for a new Borough Park at the northeast corner of North Center Street and East High Street ($100,000 and $150,000).
  • 1995: $419,500 was borrowed to purchase a 1995 GMC 4x4 motor vehicle from Falchini Motors.
  • 2000: $1,000,000 in lease rental debt was incurred for improvements to the sanitary sewage system.
  • 2001: $800,000 was borrowed for the construction of a youth recreational facility.
  • 2004: A loan not to exceed $250,000 was secured using a Certificate of Deposit as collateral.

21st Century Infrastructure (2005–2020)

Recent entries highlight large-scale projects for water production, wastewater facilities, and sidewalks:

  • 2005: Large debts were incurred for water production/distribution facilities ($4. 3 million) and the Downtown Streetscape Project ($500,000).
  • 2007: Lease rental debt was incurred for wastewater facilities ($2. 3 million and $900,000).
  • 2009: Refinancing of $94,500 for the downtown streetscape project.
  • 2011: $750,000 was borrowed for the construction of a swimming pool.
  • 2012: A major lease rental debt of $5,050,000 was incurred for public water facilities.
  • 2015: A general obligation debt bridge loan of $750,000 was taken for a sidewalk project.
  • 2017: Significant borrowing occurred for sewer projects, including a $9,000,000 lease rental debt and a $1,000,000 bridge loan.
  • 2020: A general obligation debt was incurred for a sidewalk project.