Executive Summary

Inframark submitted the April 2026 monthly report for the Ebensburg water treatment facility. Key operational highlights include:

  • Water Production: The plant treated 30,000,000 gallons of reservoir water (averaging 1,000,000 gallons per day).
  • Purchased Water: An average of 61,045 gallons per day was purchased from Saltlick and blended into the distribution system.
  • Maintenance: Preventative maintenance was performed on blowers for air scourer filters 1, 2, and 3. Oil was changed, belts were replaced, and motors/greased.
  • Safety: New safety signs regarding confined spaces and hazardous chemicals were installed. There were no accidents in April; personnel have worked 2,281 days without an injury.
  • Events: A tour of the facilities was hosted for the new borough manager and council members on April 9th.
  • Inspections: The second quarter filter evaluation for Filter #1 was completed on April 21st in partnership with Water Service Professionals. The filter was found to be in excellent condition.
  • Upcoming Work: Inframark is coordinating with Greenland Construction for upper reservoir intake valve repairs and working with Stiffler on the five-year recertification of the risk and resilience assessment.
  • Reservoir Status: The upper reservoir water level is currently 2. 5 feet below full pool level.

Financial Update

Maintenance Expenditures The following expenses were recorded for the month:

  • Water Service Professionals: $2,860. 00 (Annual Filter Inspection/Media Analysis)
  • Napotnik's: $675. 00 (Welder)
  • Applied: $207. 70 (Blower Belts)
  • Amazon: $203. 27 (Building signs/safety/PVC reamer)
  • Ace Hardware: $150. 53 (Plumbing/Lagoon Pond Rope)
  • The Home Depot: $23. 85 (Hose connectors)
  • The Long Barn: $14. 10 (Shelving)

Caps for WTP

  • Maintenance Cap: $4,134. 45 spent this month; $18,102. 09 remaining balance.
  • Chemical Cap: $12,933. 50 spent this month; $50,429. 56 remaining balance.

On the Radar

Items currently being tracked or planned for future action include:

  • DAF Spare parts
  • Upper reservoir intake valves
  • SCADA upgrades
  • Lighting improvements
  • Loading dock rehabilitation

Personnel

The report lists the following staff members and their certifications:

  • Kyle Smiley (Operator III): PA Class A, E, Water Subclass 1,10,11,12; PA Class A, E, Wastewater Subclass 1.
  • Tony Perott (Operator II): PA Class C, E, Water Subclass 1,6,7,8,12.
  • Shawn Jones (Mechanic II): Training for PA DEP exam.
  • Joseph Pompa (Operator in Training): Training for PA DEP exam.
  • Luke Byrne (Project Manager): PA Class A, E, Water Subclass 1,7,8,10,11,12; PA Class A, E, Wastewater.