Ebensburg WWTP Monthly Report: November 2024

Submitted by: Inframark Water Infrastructure Operations
Date of Report Submission: December 16, 2024
Facility: Ebensburg Wastewater Treatment Plant (WWTP)


Executive Summary

  • Wastewater Treated: 19. 6 million gallons in November (avg. 652,200 gal/day).
  • Sludge Disposal: 8. 7 tons of dry sludge sent to landfill via weekly centrifuge operation.
  • Repairs & Maintenance:
    • Fixed leak on process water line.
    • Old yard hydrant broken and terminated underground.
    • Winter prep underway: summer equipment moved to blower building; winter gear brought to main garage.
  • HVAC & Heating System:
    • McCarl’s HVAC performed annual cleaning/maintenance on oil boiler and electric unit heaters (Nov 21).
    • One circulating pump beyond repair due to age; project quoted for new pump, air separator, and pipe replacements.
  • Grit Removal System:
    • Added three auger cycles per day — results successful, more grit removed daily.
  • Equipment Issues:
    • 1995 case loader spraying hydraulic oil from pump — unusable due to severity; Inframark working with borough to find replacement.
  • New Equipment Ordered:
    • Dodson Electric ordered two explosion-proof unit heaters for headworks building.
    • Original ETA: Nov 7 → Revised ship date: Jan 2, 2025.
  • Sewer Lift Stations:
    • Regular inspections, pump runtime documented, generators exercised.
    • Basket screeners cleaned out; heaters/exhaust fans adjusted for winter.
    • Trees/limbs cleared from Emerald Estates lane pump road; marker flags placed for plowing.

Operations & Compliance

  • Testing Schedule:
    • Effluent pH, alkalinity, dissolved oxygen: tested daily.
    • SBR tank testing (Settleability, MLSS): Mon/Wed/Fri.
    • Influent/effluent compliance testing (TSS, BOD, CBOD, Phosphorus, Nitrogen, Ammonia, Fecal Coliform): Tue/Thu.
    • UV intensity recorded; composite samples collected.
  • Reporting:
    • All data entered into WIMS daily for E-DMR monthly reporting.
    • Monthly reports submitted electronically to DEP by 28th of each month.
  • Stormwater Inspections: Conducted regularly.

Plant Operations Highlights

  • Inspected Industrial Park and Emerald Estates pump stations.
  • Daily screening unit cleanouts; grit removal optimization.
  • Adjusted SBR phases and dissolved oxygen levels for seasonal changes.
  • Sludge pumped to digesters; decanted to allow thickening.
  • Centrifuge operations, polymer feed system optimized.
  • Removed floating debris from SBR tanks; altered aeration cycles for sludge optimization.
  • Checked influent/effluent samplers daily; UV operational checks completed.

Maintenance & Repair Activities (97 Work Orders Completed)

  • Greased decanters on SBR tanks and screening unit.
  • Hosed/cleaned influent screening unit daily.
  • LOTO applied to wet well pump; cleaned sludge pump access hatches.
  • Replaced cracked polymer pump head.
  • Repaired process water lawn hydrant.
  • Cleaned headworks bypass channel; inspected grit removal oil levels.
  • Cleaned wet well pump floats and UV basin.
  • Cleaned #3/#4 digester weirs/troughs.
  • Completed monthly safety inspections.
  • Checked oil/belts on blowers daily; greased weekly.
  • Hosed centrifuge building floor; greased centrifuge.
  • Inspected State School weir box.
  • Swept/mopped control building floors weekly.

Financial Update

Maintenance Expenditures

  • Dodson Electric: $20. 07 (Outside light)
  • LB Water: $180. 26 (Centrifuge meter piping)

Caps for WWTP

Category Contract Total/Year Previous Balance Spent This Month Remaining Balance
Maintenance Cap $25,000 $755. 61 $200. 33 $555. 28
Sludge Cap $80,000 $9,263. 33 $16,489. 66 -$7,226. 33

Note: Sludge Cap is over budget by $7,226. 33.


Health & Safety

  • No accidents in November.
  • Personnel have worked 1,765 days (4 years 11 months) without an accident/injury.
  • Training & Presentations:
    • Weekly tailgate meetings
    • Winter weather SOP
    • LOTO SOP
    • Dissolved Oxygen meter calibration

Personnel & Certifications

Name Title Operator Certifications
Randy Lauer Operator II PA Class A, E, Wastewater Subclass 1,2,3,4
Kyle Smiley Operator II PA Class A, E, Water Subclass 1,10,11,12
Tony Perott Operator I PA Class C, E, Water Subclass 1,6,7,8,12
Shawn Jones Operator in Training Training for PA DEP exam
Luke Byrne Project Manager PA Class A, E, Water Subclass 1,7,8,10,11,12; PA Class A, E, Wastewater

Report prepared by Luke Byrne for the Ebensburg Borough Authority.