Ebensburg WWTP Monthly Report: February 2026
Date: March 23, 2026 Prepared by: Luke Byrne, Project Manager
This report details the operations and maintenance of the Ebensburg wastewater treatment facility for February 2026.
Executive Summary & Operations
- Wastewater Treated: The plant treated a total of 27,549,100 gallons, averaging 983,896 gallons per day.
- Sludge Disposal: 8. 1 tons of dry sludge were sent to the landfill.
- Compliance: All samples collected in February were in compliance with regulations. Testing for pH, dissolved oxygen, and other parameters was conducted as scheduled.
Maintenance & Repairs
Staff completed 82 work orders during the month. Key activities included:
- Frozen Line Repair: The well water line froze due to extreme cold. Staff thawed the 2-inch line using warm water and installed a new hose bib. Plumbing modifications were made to isolate the headworks and centrifuge lines in case of future breaks.
- Pump Repairs: Packing flange bolts on sludge pump #1 were replaced after the old ones corroded. Process water pump #1 was pulled for evaluation due to recurring faults; a rebuild kit has been ordered.
- Grit Blower Rebuild: Grit blower #2 was taken out of service, rebuilt with new bearings and seals, and is now running well.
- Other Maintenance: Work included greasing decanters, cleaning screening units and UV channels, installing LED lights in the basement, and performing monthly safety inspections.
Financial Update
Maintenance Expenditures:
- Amazon: $1,086. 48 (Foot valve/blower/battery tenders/computer screen)
- The Meter Guy: $500. 00 (Annual meter calibrations)
- Lubrication Engineers: $190. 83 (Oil/grease)
- YSI: $223. 06 (Dissolved air probe cover)
- Long Barn: $181. 35 (Heat tape/tarp)
- Ace Hardware: $150. 80 (Heat tape compression fittings)
- Vevor: $142. 55 (Welding Cart)
- Tractor Supply: $69. 88 (Hose repairs/hose bib/well line)
- Wal-Mart: $49. 11 (Centrifuge liner hold downs/folders)
- Uni-mart: $42. 40 (Propane)
- Automation Direct: $54. 06 (UV fitting)
Budget Caps:
- Maintenance Cap: $2,690. 52 spent this month; $23,806. 73 remaining balance.
- Sludge Cap: $6,823. 72 spent this month; $74,496. 24 remaining balance.
- Chemical Cap: No spending this month; $21,893. 58 remaining balance.
Health & Safety
- There were no accidents in February.
- Personnel have worked 2,219 days (6 years and 2 months) without an accident or injury.
- Ongoing safety activities include weekly tailgate meetings, safety flash reports, and weekly process control meetings.
Personnel
The following staff members are certified for their roles:
- Randy Lauer (Operator II): PA Class A, E, Wastewater Subclass 1,2,3,4
- Kyle Smiley (Operator III): PA Class A, E, Water Subclass 1,10,11,12; PA Class A, E, Wastewater Subclass 1
- Tony Perott (Operator I): PA Class C, E, Water Subclass 1,6,7,8,12
- Shawn Jones (Mechanic II): NA
- Joseph Pompa (Operator in Training): Training for PA DEP exam
- Cody Williams (Operator): PA Class E Water Subclass 12
- Luke Byrne (Project Manager): PA Class A, E, Water Subclass 1,7,8,10,11,12; PA Class A, E, Wastewater