Executive Summary

  • The plant treated 33,735,600 gallons of wastewater in April — averaging 1,124,500 gallons per day.
  • All operational and testing requirements were met.
  • One fecal coliform exceedance occurred on April 2nd due to hydraulic overload from heavy rainfall (~5 inches over 4 days).
  • Centrifuge ran twice weekly; 12. 703 tons of dry sludge sent to landfill.
  • Staff repaired centrifuge electrical disconnect switch with Dodson Electric on April 1st; spare ordered.
  • Extensive cleaning of process water channel chamber completed to remove duckweed buildup; skimmer installed.
  • On April 30th, SBR#1 air valve actuator failed during decant cycle. Motor rebuilt but failed again — underlying gear issue identified. New actuator ordered with expedited shipping; two additional actuators ordered to replace antiquated SG series.
  • Sewer lift stations inspected regularly; basket screeners cleaned, heaters reduced for summer, vegetation cleared. Repairs at industrial park Marine lift station scheduled with RAM.

Operations & Compliance

Testing Schedule:

  • SBR Tank Testing (Mon/Wed/Fri): Settleability, MLSS, MLVSS.
  • Influent/Effluent Testing (Tue/Thu): TSS, BOD, CBOD, Phosphorus, Total Kjeldahl Nitrogen, Nitrate-Nitrite, Ammonia as N, fecal coliform.
  • Daily: Effluent pH, Dissolved Oxygen, UV intensity recording, composite samples.
  • All data entered into WIMS daily; monthly reports sent to DEP by 28th.

Plant Operations:

  • Inspected Industrial Park and Emerald Estates pump stations.
  • Collected composite samples; inspected screening units, grit removal processes.
  • Adjusted SBR phases; managed WAS pumps vs settleability.
  • Sludge pumped to digesters for thickening; decanted digesters.
  • Daily lab work, centrifuge ops, polymer feed optimization, sludge dumpster prep.
  • Removed floating debris from SBR tanks; altered aeration cycles to optimize sludge.
  • Checked influent/effluent samplers daily; performed UV operational checks.

Maintenance & Repair

  • Completed 115 work orders in April.
  • Greased decanters on SBR tanks and screening unit.
  • Cleaned out process water chamber; installed duckweed skimmer.
  • Cleaned #3 and #4 digester weirs/troughs.
  • Sludge pump check valve leaking — parts ordered.
  • Disassembled and cleaned polymer feed system.
  • Changed oil in mowers; replaced Auma actuator motor on SBR#1.
  • Completed monthly safety inspections.
  • Hosed/cleaned U. V. trough, bulbs, sensors.
  • Influent screening unit hosed/cleaned daily.
  • Checked oil/belts on blowers daily; greased weekly.
  • Hosed centrifuge building floor; greased centrifuge.
  • Inspected State School weir box.
  • Swept/mopped control building floors weekly.

Financial Update

Maintenance Expenditures:

Vendor Amount Item Description
VEVOR $215. 02 Water pump
Ace Hardware $129. 91 Hoses for centrifuge and digesters
Online Supply $166. 42 Screen for skimmer
Long Barn $287. 73 Plumbing, lumber for UV deck repairs
All American Fire Equipment $86. 92 Cam lock fittings for pumps
Tractor Supply $16. 95 HD suction gun
Amazon $208. 88 Hydraulic oil for UV/three-inch pump fittings

Caps For WWTP:

Category Contract Total/Year Previous Balance Spent This Month Remaining Balance
Maintenance Cap $25,000 $16,601. 47 $1,111. 83 $15,489. 64
Sludge $80,000 $50,177. 29 $818. 68 $49,358. 61

Health & Safety

  • Zero accidents in April.
  • Personnel have worked 1,551 days (4 years, 4 months) without injury.
  • Training activities included:
    • Weekly tailgate meetings
    • DMR SOP review
    • Lock out tag out SOP review

Personnel

Name Title Operator Certifications
Sharon Burkett Lead Operator PA Class A, E, Wastewater Subclass 1,2,3,4,5
Kyle Smiley Operator II PA Class A, E, Water Subclass 1,10,11,12
Randy Lauer Operator II PA Class A, E, Wastewater Subclass 1,2,3,4
Tony Perott Operator I PA Class C, E, Water Subclass 1,6,7,8,12
Shawn Jones Operator in Training Training for PA DEP exam
Luke Byrne Project Manager PA Class A, E, Water Subclass 1,7,8,10,11,12; PA Class A, E, Wastewater

On the Radar (Upcoming Items)

  • Level sensors for SBR tanks
  • UV chamber and SBR cleaning
  • Centrifuge flow meter
  • Screening unit bearings and brushes
  • SBR air valve actuators

This report reflects full compliance, proactive maintenance, and transparent financial tracking for the Ebensburg Wastewater Treatment Plant during April 2024.