Executive Summary of Operations
Inframark submitted the May 2026 monthly report for the Ebensburg wastewater treatment plant (WWTP) to the Borough of Ebensburg. Key operational statistics and maintenance activities included:
- Wastewater Volume: The plant treated a total of 27,853,000 gallons during the month, averaging 898,484 gallons per day.
- Sludge Disposal: The centrifuge was operated weekly, resulting in 8. 99 tons of dry sludge sent to the landfill.
- Lighting Upgrades: Staff replaced damaged high-pressure sodium fixtures with new LED lights to improve safety and reduce electrical costs.
- Equipment Repairs:
- UV Unit: A nonfunctional UVT sensor was repaired by replacing a damaged 1-inch glass rod with an acrylic round rod.
- Generator: Annual preventive maintenance was performed on the Cummins generator. A factory exercise program was identified as the cause of monthly power outages and has been deleted from the panel.
- Influent Sampler: New pump tubing was installed to replace old, cracked, and leaking lines.
- SBR #4 Air Valve: The AUMA actuator failed, preventing the valve from shutting. It was replaced, and the old unit was sent to the factory for repair.
- Perimeter Fence: Repairs were completed on fence sections damaged by a tree.
- Future Planning: Contractors were onsite to quote necessary repairs, which will be budgeted for in capital planning.
Health & Safety
- Accident Record: There were no accidents in May. Personnel have now worked 2,312 days (6 years and 5 months) without an accident or injury.
- Training: Inframark conducted weekly tailgate meetings, safety flash reports, and process control meetings.
Upcoming Maintenance (On the Radar)
The following items are scheduled or pending for future attention:
- SCADA programming
- Lawn repairs
- Influent splitter box lid repair
- SBR #2 air valve
- Lighting
Personnel and Certifications
The following staff members are listed with their titles and operator certifications:
- Randy Lauer (Operator II): PA Class A, E; Wastewater Subclass 1,2,3,4
- Kyle Smiley (Operator III): PA Class A, E; Water Subclass 1,10,11,12; Wastewater Subclass 1
- Tony Perott (Operator I): PA Class C, E; Water Subclass 1,6,7,8,12
- Shawn Jones (Mechanic II): NA
- Joseph Pompa (Operator in Training): Training for PA DEP exam
- Luke Byrne (Project Manager): PA Class A, E; Water Subclass 1,7,8,10,11,12; Wastewater Subclass 1,3,4