Ebensburg Municipal Authority: August 2025 WWTP Monthly Report
Date: September 22, 2025 Prepared by: Luke Byrne, Project Manager
This report details the operations and maintenance of the Ebensburg wastewater treatment facility for August 2025.
Executive Summary & Operations
- Wastewater Volume: The plant treated a total of 16,173,900 gallons, averaging 521,738 gallons per day.
- Sludge Disposal: The centrifuge was operated twice, resulting in 8. 69 tons of dry sludge being sent to the landfill.
- Equipment Repairs:
- UV Unit: A faulty contactor was identified and replaced after the UV unit's coolant pump failed. A spare part was purchased.
- Centrifuge: An emergency stop was required when the polymer mixing chamber became clogged and broke.
- Maintenance Activities:
- Ongoing duckweed removal was performed.
- The process water control valve became clogged, requiring maintenance on the effluent tank.
- A new faucet was installed in the lab sink.
- Sewer lift stations were inspected regularly; no leaks were found, and basket screeners were cleaned.
- Dodson Electric continued work on conduit projects in the headworks.
Financial Update
Maintenance Expenditures:
- Teledyne Instruments: $272. 42 (Sampler tubes)
- Amazon: $203. 65 (Lab faucet/plumbing fixtures)
- Tractor Supply: $184. 40 (Weed killer/hydraulic fluid)
- Sheetz: $49. 29 (Fuel for mower/pumps)
- Ace Hardware: $46. 57 (Toilet repairs)
- Grainger: $38. 16 (SBR hoist clamps)
- Long Barn: $13. 99 (UV Hose)
Budget Caps:
- Maintenance Cap: $11,430. 50 remaining (of a $25,950. 84 annual contract).
- Sludge Cap: $22,832. 56 remaining (of an $83,042. 76 annual contract).
- Chemical Cap: $10,846. 84 remaining (of a $23,251. 92 annual contract).
Health & Safety
- There were no accidents or injuries reported in August.
- Personnel have worked 2,039 days (5 years and 8 months) without an accident.
- Training: Weekly tailgate meetings were held, along with training on the UV coolant electrical schematic and headworks wash bar function.
Personnel
The following staff members are certified for their respective roles:
- Randy Lauer (Operator II): PA Class A, E; Wastewater Subclass 1,2,3,4
- Kyle Smiley (Operator II): PA Class A, E; Water Subclass 1,10,11,12
- Tony Perott (Operator I): PA Class C, E; Water Subclass 1,6,7,8,12
- Shawn Jones (Operator in Training): Training for PA DEP exam
- Cody Williams (Operator in Training): Training for PA DEP exam
- Luke Byrne (Project Manager): PA Class A, E; Water Subclass 1,7,8,10,11,12; Wastewater
Upcoming Items ("On the Radar")
- SCADA programming
- Process water cover installation
- Grit blower repairs
- Drying bed clean out
- Scheduled Maintenance: Cummins generator annual maintenance is scheduled for all three onsite generators on September 24th.