Ebensburg Storage Dam Inspection Report Summary

This document package contains the Annual Reservoir Inspection for the Ebensburg Storage Dam, conducted in October 2023. It includes a cover letter from the engineering firm Stiffler McGraw, the official Dam Inspection Checklist form, and a note regarding the previous year’s review.

Key Details

  • Dam Name: Ebensburg Storage Dam
  • Location: Ebensburg Borough, Cambria County, Pennsylvania
  • Owner: Ebensburg Borough
  • Operator: Kelly Cook (Borough Manager)
  • Inspection Date: October 10, 2023
  • Report Date: October 25, 2023
  • Engineering Firm: Stiffler McGraw (Engineers, Surveyors, Architects)
  • DEP File No. : 011-061

Inspection Findings

The dam was found to be in generally good condition, but the following specific issues were noted and require attention:

  • Spillway Wall Cracks:
    • A growing crack was previously identified in the upper section of the downstream western spillway wall, which had been sliding downhill.
    • In 2019, the damaged upper section was removed and cut flush.
    • Current Status: Three new hairline cracks were observed on the lower wall section where the upper part was removed. These must be monitored to ensure the lower section does not slide similarly.
  • Vegetation: Vegetation on the upstream embankment slope requires cutting.
  • Wet Area/Seepage:
    • A wet area was identified on the southern side of the dam access road.
    • Flow rate increased from approximately 1 GPM last year to 2-3 GPM currently.
    • The wet area extends into a patch of wetlands near the Water Treatment Plant Parking Area.
    • It is unclear if this is due to dam seepage or mountain runoff, but it must continue to be monitored for changes.

Personnel

  • Inspectors: Jonah E. Salyards, P. E. and Tyler M. McGraw, P. E. (Stiffler, McGraw & Assoc. )
  • Signed By: Jonah E. Salyards, P. E. (Registered Professional Engineer)

Additional Notes

  • The package includes a placeholder page indicating that the DEP Review Letter for the 2022 Inspection Report was not received.
← Back to Documents